Energy Rebound

Live Pilot Telemetry

MP-20 pilot skid · CTBD line

Simulated IoT feed from an active 20 ft containerized skid. Values are representative demo data.

Streaming
Influent TDS
8,500 ppm
Raw blowdown
Effluent TDS
350 ppm
95.9% removal
Silica (SiO₂) Removal
94.2%
Selective nano-binding
Specific Power
0.88 kWh/m³
RO baseline 3.5 kWh/m³
System Flow
27.2 m³/hr
120 GPM

24-hour TDS log (ppm)

Skid health

  • Magnetic Nano-SeparatorOK
  • Hydrocyclone RegenerationOK
  • Chemical Dosing LoopOK

All systems green.