Live Pilot Telemetry
MP-20 pilot skid · CTBD line
Simulated IoT feed from an active 20 ft containerized skid. Values are representative demo data.
Streaming
Influent TDS
8,500 ppm
Raw blowdown
Effluent TDS
350 ppm
95.9% removal
Silica (SiO₂) Removal
94.2%
Selective nano-binding
Specific Power
0.88 kWh/m³
RO baseline 3.5 kWh/m³
System Flow
27.2 m³/hr
120 GPM
24-hour TDS log (ppm)
Skid health
- Magnetic Nano-SeparatorOK
- Hydrocyclone RegenerationOK
- Chemical Dosing LoopOK
All systems green.